Step 1: Prepare the Footing

preparing the footing

Build the footings according to the design, with rebar dowels placed at the correct spacing.

Clean the footings and make sure they’re flat. This will help the blocks sit evenly.

Snap chalk lines on the footing to mark the inside and outside edges of the ICF wall.

At the location of the T-wall intersection, mark the width of the concrete core of the intersecting wall.