The Pre Pour Inspection quiz will cover some of the basic material presented in this lesson. Please answer the questions below. After completing the quiz you may mark this lesson complete and continue on to the next lesson.

Note: All quizzes in this course require an 80% passing grade to continue to the next lesson. If you do not meet the required score, click the “View Questions” button to see which questions were answered incorrectly and then click “Restart Quiz” to try again. 

Good luck!


Vertical rebar in the footing should:
How can a smooth screeding surface be accomplished at the top of the wall?
Check all that apply.
What is the typical recommended concrete slump out of the pump?
What is the typical PSI of concrete for an ICF job?
Why is it not recommended to use a concrete that is too wet?
Where might additional bracing be required?
Squaring the ICF walls: